Kanban v2

I am trying the plugin. I found it very promising and I am super excited to be allowed to test it. I found some features that probably can add value to the experience with it, and I share my thoughts:

What about adding a batch of topics (not by tag but manually choosing them) to boards instead of one by one?

This is the first limitation that I found in my first drafts and experimentation into it. Perhaps it was not originally with this in mind but can be extended to more use cases this way.

Other ideas that come to mind, with no particular order:

Note that I am using Horizon and my experience could change a bit from Foundation.

  • Allow clicking on a board’s card to enter the board, not only from their title.

  • Display the solved icon in solved topics, the assigned icon in assigned topics, and the closed icon in already closed topics. It will free tags for different actions.

  • Make the full-screen toggle be really full-screen in Desktop, or disable it. Now it is a little confusing (in Horizon) and it is not giving a proper full-screen experience.

  • Calendar integration for weekly view, allowing to arrange the cards between them, especially for created events. Proper integration with the Assign plugin as well.

  • Extensive workflow integration for automatically adding, updating, and moving topics between cards, and cards between boards.

  • In a non-intrusive way, indicate that the cards can be scrolled horizontally. Once users get used to the panels, it’s no longer necessary, but if this view is used by default in categories like support or features, newer users might get lost.

It occurs to me that a simple, subtle CSS gradient line that appears only once per session might be enough. I know that eventually the design team will figure out the most effective way to handle this.

  • Allow moving topics/cards freely between columns. Again, it is probably not the design principle, but it is very useful for teams with more informal work structures, which are based primarily on experimentation and adaptive change.

Regarding the plugin’s name, I’m glad you’re considering it, and I agree that “Kanban” is —and at the same time isn’t— widely used. At least when looking at different communities, outside of those that typically follow processes and procedures with the support of project managers or similar staff.

I’d just like to add a few words that I think could describe this great functionality (avoiding commercial terms and focusing on functionality): To-do, Task, Status, Activity [Boards].

5 likes